agentleFS
EveryIncEveryInc/compound-engineering-plugin/skills/ce-plan/SKILL.md

ce-plan

Skill25k starsChanged 4 months agoMITView on GitHub

Create structured plans for multi-step work, including software and non-software tasks. Use when asked to plan, break down implementation, plan from requirements, or deepen an existing plan; prefer ce-brainstorm for exploratory framing.

2 other projects use a version of this.

Adopted by

Steady: 0 new projects took it in the last 4 weeks, none the 4 weeks before.thin data

Week of Sep 27: 0 new projectsWeek of Oct 4: 0 new projectsWeek of Oct 11: 0 new projectsWeek of Oct 18: 0 new projectsWeek of Oct 25: 0 new projectsWeek of Nov 1: 0 new projectsWeek of Nov 8: 0 new projectsWeek of Nov 15: 0 new projects
Sep 2026Oct 2026Nov 2026
New projects taking a version of this file each week, over the 8 weeks our latest run read: only 0 in all, so this is a hint, not a trend.

Most recently taken up by

Who's talking about EveryInc/compound-engineering-plugin

The biggest 5 of 76 mentions linking to the repository that our crawl found. Each line is their own headline.

See all 76

Talked about on GitHub and Bluesky (76 times).

On GitHub · 50

45 more on GitHub

On Bluesky · 26

21 more on Bluesky

The file

We split this skill into the rules it gives an agent

8 rules. About 0 are common, 2 are distinctive, and 6 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈2

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 6

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    An explicit invocation always produces a plan: Never classify a direct invocation as "not a planning task" and route out.

    line 13
  2. Distinctive:

    Research, decide, and write the plan — never implement: Do not write production code, run tests, or learn from execution-time results.

    line 15
  3. Very specific:

    Output first: Read references/output-mode.md before interpreting any phase.

    line 43
  4. Very specific:

    Resume, deepen, approach, and domain: Read references/resume.md before acting.

    line 44
  5. Very specific:

    Read references/research.md before gathering context.

    line 49
  6. Very specific:

    Read references/structure.md before resolving questions or structuring the plan.

    line 50
  7. Very specific:

    Read references/final-review.md before the pre-write review.

    line 55
  8. Very specific:

    Write the plan before presenting options, then complete the confidence path final-review.md defines.

    line 58

≈ “Common” is an estimate: at least 1 in 5 of the 213,895 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

Create Technical Plan

The current year is 2026.

Outcome: a plan for carrying out and checking the agreed work while preserving its outcome and constraints. Resolve technical choices from evidence; leave adequate instructions unchanged. ce-brainstorm defines WHAT, ce-plan plans HOW, and ce-work executes. A prior brainstorm is optional.

An explicit invocation always produces a plan. Never classify a direct invocation as "not a planning task" and route out. It may select any output contract below, and the smallest valid plan is a few sentences in chat.

Research, decide, and write the plan — never implement. Do not write production code, run tests, or learn from execution-time results. Directional pseudo-code and grammar sketches may communicate design; changing code to see what happens belongs in ce-work.

Mandatory Completion Contract

A run is complete when its output contract's done condition is met. Every normal interactive branch that produces a plan artifact or checkpoint is incomplete until the user has been asked what to do next. A request that already authorizes the next action is that answer. For a Durable software implementation-plan run that continues past the resume check, that means the Phase 5.4 menu has been presented and the selected action has actually fired. For Direct, the change stated and the handoff offered; for a Chat brief, the brief and its one-line save-or-ce-work offer in chat. Neither presents the Phase 5.4 menu. Non-software plans and approach-level plans end with the handoff their reference workflow defines. A run that only answers a question may end after the answer unless its reference requires a save or share step.

Writing the file, checking confidence, and running or explicitly skipping ce-doc-review are intermediate milestones. In pipeline mode, the run is complete only when the plan, the confidence check, and the non-interactive document-review state have been returned to the caller, which decides what happens next.

Interaction Method

Ask one question at a time through the host's blocking question tool already in the current tool list. Match by capability; never probe a user-facing tool to discover it. If none is listed or a real question call errors, render numbered choices in chat; never silently skip a required question. If no feature description was supplied, ask what to plan and wait.

Output Contract

Decide which output contract applies at the start of scoping (Phase 0.6), before choosing depth and before the scoping synthesis. It applies only when no resume route (Phase 0.1) fired and the source check (Phase 0.2) found no upstream artifact. Ground it with bounded inline reads of what the request names, without dispatching a subagent. Select one:

  • Direct — the work can be stated, done, and verified in one pass with no decision the user would weigh. State the change in a few sentences and offer the handoff to ce-work or the user; execution starts only with implementation authority, as references/output-contracts.md defines.
  • Chat brief — bounded work with at most one decision the user would weigh and no risk surface. Deliver it in chat and stop.
  • Durable — everything else. Continue the workflow below.

references/output-contracts.md defines Direct and Chat brief; read it when either is selected. When the tier is still uncertain after those reads, take the heavier one. If a read surfaces a decision the user would weigh, a risk surface, or multi-pass verification, move to the heavier tier before emitting anything. Durable regardless of size: a run with no synchronous user to act on chat this turn (pipeline, headless, goal- or scheduler-driven), a request whose wording asks for a plan, a plan file, or an output format, a request that continues an existing plan's item, and a risk surface — authentication, payments, migrations, external contracts.

Workflow

Phases run in order unless a reference routes out or short-circuits. Read a phase's required reference in full when you enter that phase; a read made before that phase does not satisfy it, and a reference named for the final steps is read again at its step even when already in context. If a required reference cannot be read, stop before the action it governs and report the blocker and recovery path; never reconstruct the missing rules from memory. In pipeline mode, every required-reference failure returns status: blocked, phase, blocker, and recovery_path; include artifact_path and preserve the artifact when one exists. Report blocked even when an artifact exists.

Phase 0: Output, Resume, and Scope

  1. Output first. Read references/output-mode.md before interpreting any phase. It defines token parsing, output and confirmation precedence, renderer selection, artifact location, and when a repository may be resolved.
  2. Resume, deepen, approach, and domain. Read references/resume.md before acting. It defines resuming an existing plan, enriching a requirements-only plan, deepening, approach-level planning, and the software/non-software split. Follow any terminal route it selects; otherwise continue.
  3. Source and scope. Read references/intake.md before Phase 0.2 and follow it through Phase 0.7. It defines finding and preserving the upstream artifact, routing out to bootstrap work, blocking questions, depth, named resources, and the scoping synthesis; the Output Contract decision above happens inside it. Do not pass a decision point that has not resolved.

Phases 1-4: Research and Compose

  1. Read references/research.md before gathering context.
  2. Read references/structure.md before resolving questions or structuring the plan.
  3. Compose from references/plan-sections.md plus the format-rendering reference selected by output-mode.md.

Phase 5: Review, Write, Deepen, and Hand Off

  1. Read references/final-review.md before the pre-write review; it defines Phase 5.1 through 5.3.2. On an interactive run from a brainstorm, the user sees the Phase 5.1.5 scoping synthesis in chat before the write: a confirmation to wait on, or its one-line auto-proceed announcement.
  2. Model elevation. Immediately before authoring, read references/reasoning-elevation.md, resolve the choice at this boundary, and follow it. Do not author until activation resolution has completed and any selected dispatch or transparent fallback has settled.
  3. In pipeline mode, evidence that invalidates a decision settled earlier in the session stops the write. Return the exact token settled-decision-invalidated, the decision, and the reason; do not resolve it silently.
  4. Write the plan before presenting options, then complete the confidence path final-review.md defines.

STOP. Read references/plan-handoff.md immediately before Phase 5.3.8 and 5.4 (document review and the handoff menu). Document review is mandatory for a Durable plan and the default is non-interactive (mode:non-interactive). In interactive software runs, ask exactly: "Plan ready at <absolute path to plan>. What would you like to do next?" Present its menu and wait. If the selection arrives after a user turn, reload references/plan-handoff.md before acting. Rendering the menu, receiving a selection, or announcing a route is not completion; execute the selected action.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.