plan-sync

Skill0 starsChanged 5 months agoMITView on GitHub

Optional integration: parse a plan markdown file into a validated manifest and import it into tools-project via the REST API (POST /v1/projects/{id}/plan-import). Dry-run gate and operator confirmation required.

  • Reads credentials
  • Sends data out

1 other project uses a version of this.

Adopted by

Most recently taken up by

The file

Show its rules and text

We split this skill into the rules it gives an agent

14 rules. About 0 are common, 5 are distinctive, and 9 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈5

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 9

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Very specific:

    Key secrecy: never print/echo/log the key.

    line 23
  2. Distinctive:

    Auth/RBAC failures are reported, never worked around: No privilege escalation attempts, no key sharing.

    line 25
  3. Distinctive:

    Agent parses semantics, not a rigid grammar: If a section is ambiguous or a table lacks the documented columns → stop and ask (proposal D3 …

    line 27
  4. Very specific:

    Never write to the plan file or anything under .work/ (sync is one-way, invariant I1).

    line 130
  5. Very specific:

    If --project argument provided:

    line 175
  6. Distinctive:

    If UUID format → use directly.

    line 176
  7. Very specific:

    If exactly one match → show Project: <name> (<id>) and ask for confirmation.

    line 178
  8. Distinctive:

    If zero or multiple → ask operator to disambiguate.

    line 179
  9. Very specific:

    Read the plan file at <plan path>.

    line 183
  10. Very specific:

    Every milestone has non-empty summary

    line 195
  11. Very specific:

    Every task description starts with ## Intent and contains ## Acceptance (when acceptance exists) and ## Technical details (when provenance …

    line 196
  12. Distinctive:

    All statuses mapped to valid vocab (unknown → ask)

    line 197
  13. Very specific:

    Wait for explicit yes. If not yes → stop.

    line 236
  14. Very specific:

    Run key resolution, test GET /v1/agent/projects, list project names/ids.

    line 261

≈ “Common” is an estimate: at least 1 in 5 of the 213,895 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
skill.md

plan-sync

Purpose: Parse a plan markdown file (typically the live plan .work/plans/full/*-full-plan.md; any plan path may be passed) into a JSON manifest v1 and import it into tools-project via the transactional plan-import endpoint. Dry-run preview and explicit operator confirmation are mandatory.

Deploy to: Any Agent OS framework (.ai, .ai.ui, .ai.biz, .ai.soc, .ai.cto, .ai.flutter, .ai.mlt) — optional integration.

Prerequisites: tools-project instance reachable; API key in ~/.tools-project-key or TOOLS_PROJECT_API_KEY env (same resolution as project-query-setup + MCP).


Hard rules

  1. Read-only toward plan sources and the repo. The only write is the single POST …/plan-import call, gated by operator confirmation.
  2. Never commit without operator confirmation. Dry-run → preview → explicit yes → commit. No confirmation = stop at preview.
  3. Key secrecy: never print/echo/log the key; never pass it on a command line (ps-visible) — read the file and set the header in-process or via stdin; never write key material to tmp/, repo files, or shell history; remote BASE_URL must be https://….
  4. No MCP changes; no new endpoints; no local database access; no raw SQL. The MCP remains read-only (project-query-setup hard rule 2).
  5. Auth/RBAC failures are reported, never worked around. No privilege escalation attempts, no key sharing.
  6. Terse responses; Operator handoff contract (Form A/B) at end of turn. Per SKILL_DEPENDENCIES.md.
  7. Agent parses semantics, not a rigid grammar. If a section is ambiguous or a table lacks the documented columns → stop and ask (proposal D3 rejected deterministic parsers for exactly this reason).
  8. Never edit the plan file or anything under .work/. Sync is one-way (invariant I1). Format drift is fixed in this skill.

Modes

InvocationMode
@plan-sync statusConnectivity + key + base URL check; list reachable projects (also the setup verification)
@plan-sync sync - <plan path>Full flow: parse → validate → dry-run → preview → operator confirmation → commit → report (default)
@plan-sync dry-run - <plan path>Same as sync but stops after the preview; never commits
@plan-sync helpUsage, auth setup pointer (@project-query-setup key), limits

Optional argument on sync/dry-run: --project <uuid|slug|project_key>. If omitted or not a UUID: resolve via GET /v1/agent/projects with the same key, match slug/project_key, and show the matched project name + id for operator confirmation before any POST. If ambiguous → ask, never guess.


Auth & endpoint resolution (mirror the MCP exactly — zero new config)

  1. Key: env TOOLS_PROJECT_API_KEY → file ~/.tools-project-key (first line that is not BASE_URL=…) → env AGENT_API_KEY (legacy). Same order as mcp_server.py:41-56.
  2. Base URL: env API_BASE_URL → BASE_URL= line in the key file → http://localhost:8300. Same as mcp_server.py:59-74.
  3. Missing/empty key → stop, print @project-query-setup key guidance. Never invent a key.
  4. Security hard rules (copy into skill): never print/echo/log the key; never pass it on a command line (ps-visible) — read the file and set the header in-process or via stdin; never write key material to tmp/, repo files, or shell history; remote BASE_URL must be https://….
  5. HTTP status mapping:
    • 401 → key missing/invalid → @project-query-setup key
    • 403 → project role < contributor → ask owner for role
    • 404 → wrong project id
    • 400 → print the field-error list verbatim and fix the manifest (nothing was written)
    • 500 → project unchanged (transaction rolled back) → report and stop

Manifest envelope (v1) — embed this in the skill

{
  "manifest_version": 1,
  "source_path": ".work/plans/full/20260925-full-plan.md",
  "plan_version": "v1.9",
  "project": {"name": "…", "key": "…", "description": "…"},
  "milestones": [{"plan_ref": "M1", "key": "M1", "name": "…", "summary": "One plain sentence describing the milestone goal.", "description": "…", "sort_order": 1, "status": "pending"}],
  "tasks": [{"plan_ref": "M1-T1", "milestone_ref": "M1", "title": "Enterprise customization cascade (T3, ADR 020)", "description": "## Intent\nImplement the location scope layer cascade (org default → practice → clinic) with safety floors.\n\n## Acceptance\n- A lower scope cannot override an org safety floor\n- A blueprint import carries no PHI and lands disabled\n\n## Technical details\n- plan_ref: M12-T15\n- plan_version: 1.9\n- source: .work/plans/full/20260925-full-plan.md\n- files: customization/**, platform/\n- traces: FR26, NFR19\n- complexity: L", "status": "pending"}],
  "components": []
}

Constants to embed:

  • manifest_version must be 1 (server rejects anything else with 400).
  • plan_ref: milestones ^M\d+$, tasks ^M\d+-T\d+$; unique within the manifest; every task's milestone_ref must exist in milestones[].
  • Limits: tasks ≤ 500, milestones ≤ 100; title 1–120 chars; name 1–200 chars.
  • Task status vocabulary — accepts plan or app vocab; mapping applied server-side: pending→todo, done→done, blocked→blocked, deferred→cancelled (app vocab todo|in_progress|blocked|done|cancelled passes through).
  • Milestone status: pending | active | blocked | done | cancelled (default pending). At most one active per project at commit (server enforces).
  • Milestone summary: one plain sentence (the plan's milestone heading or goal line). Rendered by tools-project under the milestone name. Required for every milestone.
  • Status application: statuses are applied at task creation only. Tasks that already exist in the app keep their local status (importer R13); a differing plan status is reported as an informational status_divergence conflict, never auto-overwritten. Plan done on an existing todo task therefore needs a manual change in the app UI after import.

Parsing rules (plan markdown → manifest)

From the actual plan format (.work/plans/full/*-full-plan.md):

  • Milestone = ### M<n> — <name> heading sections (metadata: **Objective:**, **Scope — in/out:**, **Deliverables:**, …). Populate plan_ref: "M<n>", name, description from the section body, sort_order = section order. summary = one plain sentence from the milestone heading or its goal line (e.g., the **Objective:** first sentence). Required.
  • Tasks = the #### Tasks - M<n>: … tables: columns | ID | Description | Files | FR/NFR | Complexity | Acceptance | Status |. ID → plan_ref (e.g. M1-T1), its section → milestone_ref.
  • title = short human label, ≤120 chars, no markdown emphasis markers (**, __, backticks), no trailing ellipsis. Derive from the Description cell: take the leading bold label or first clause before —/em-dash. Example: **Enterprise customization cascade (T3, ADR 020)** — the \location` scope layer…→Enterprise customization cascade (T3, ADR 020)`.
  • description = compose exactly three headings in this order, no --- rule, no inline **Provenance:** line:

    ## Intent
    <one plain-language sentence: what this task delivers, in the plan's own words where possible>
    
    ## Acceptance
    - <criterion 1>
    - <criterion 2>
    
    ## Technical details
    - plan_ref: M12-T15
    - plan_version: 1.9
    - source: .work/plans/full/20260925-full-plan.md
    - files: customization/**, platform/
    - traces: FR26, NFR19
    - complexity: L

    Rules:

    • A1 Heading names and order are fixed: ## Intent, ## Acceptance, ## Technical details.
    • A2 ## Acceptance items are one bullet per criterion — split the Acceptance cell on ; and sentence boundaries instead of emitting one run-on line. Never drop a criterion.
    • A3 ## Technical details is a bullet list of - key: value pairs with exact keys: plan_ref, plan_version, source, files, traces, complexity (rename fr_nfr → traces; keep FR/NFR ids verbatim, comma-separated).
    • A4 Values stay verbatim and lossless: plan_ref, source, plan_version, FR/NFR ids, file globs, complexity — no truncation, no re-wording.
    • A5 ## Intent is derived, never invented: take the plan row's own words (first clause / goal). If no separable summary, use first clause after the leading bold label.
    • A6 Omit a block only when it has no content (## Technical details may be absent for plan rows with no provenance; ## Acceptance may be absent when the plan records none). Never emit an empty heading.
  • Complexity must NEVER become priority (SPEC R22) — complexity is description text only.
  • Status cell → plan status via the mapping above; unknown status → ask operator, never guess.
  • source_path = the plan file path as given; plan_version = derived from the latest amendment when the plan has them (e.g. Amendment (v1.9 — …)), else the header (**Version:** / # Full Plan v…), else prompt. latest = the highest v number among the **Amendment (v…) lines — never the last such block in file order (plans append out of order: v1.2, v1.6, v1.7, v1.8, v1.9, v1.5, v1.4, v1.3), otherwise every task's plan_version is mislabelled. When header ≠ latest amendment, surface the derived value in the preview for operator confirmation before POST (headers often lag amendments).
  • Copy freshness: if the path points at a copy (e.g. under .work/feedback/plans-import/), compare its latest amendment (highest v, not file order) + task count against the live plan first — a stale copy silently syncs outdated content. Drift → stop and ask the operator to refresh the copy or pass the live plan (this skill never writes .work/).

Mandatory safety gates

  1. Always dry_run=true first (SPEC R7 — the preview is what the operator approves). Client-side pre-validate against §Manifest envelope before even the dry run.
  2. Preview must show: milestones/tasks created / updated / obsolete / reactivated counts + full conflicts[] (kind, plan_ref, detail) in a readable table split into Action required (resolve before/after commit) and Informational (proceeds unchanged — e.g. status_divergence), and state plainly: nothing written yet; obsolete = will be flagged, never deleted; local statuses will be preserved — plan-status-ahead-of-local is informational here and appears again in the post-commit follow-up list.
  3. Real POST only after explicit operator confirmation in the same session. No confirmation → stop at preview.
  4. Re-runs are safe (idempotent upsert matched by (project_id, plan_ref)); a second identical import reports updated counts, zero creates.
  5. Never write to the plan file or anything under .work/ (sync is one-way, invariant I1). Never edit app code — a format drift is fixed in this skill.

Report (post-commit)

Print the server's PlanImportResult: per-entity counts, conflict list, plus a one-line pointer to the project's activity feed (one kind: system summary row is the audit trail). When the plan's status differs from the resulting local status for any task, print a Follow-up in app UI checklist (M{N}-T{N}: plan=<status> / app=<status> → set in the app; MCP is read-only, import preserves local status). Close per the Operator handoff contract (Form B if follow-up decisions exist, else Form A).


Procedure (sync mode)

Step 1 — Resolve auth & endpoint

# Key resolution (mirror mcp_server.py)
if [ -n "$TOOLS_PROJECT_API_KEY" ]; then
  KEY="$TOOLS_PROJECT_API_KEY"
elif [ -f ~/.tools-project-key ]; then
  KEY=$(grep -v '^BASE_URL=' ~/.tools-project-key | head -n1)
elif [ -n "$AGENT_API_KEY" ]; then
  KEY="$AGENT_API_KEY"
else
  echo "No API key found. Run @project-query-setup key first."
  exit 1
fi

# Base URL resolution
if [ -n "$API_BASE_URL" ]; then
  BASE_URL="$API_BASE_URL"
elif [ -f ~/.tools-project-key ] && grep -q '^BASE_URL=' ~/.tools-project-key; then
  BASE_URL=$(grep '^BASE_URL=' ~/.tools-project-key | cut -d= -f2-)
else
  BASE_URL="http://localhost:8300"
fi

# Validate remote BASE_URL is https
if [[ "$BASE_URL" != http://localhost* && "$BASE_URL" != http://127.0.0.1* && "$BASE_URL" != https://* ]]; then
  echo "Remote BASE_URL must be https://"
  exit 1
fi

Step 2 — Resolve project

If --project argument provided:

  • If UUID format → use directly.
  • Else → GET $BASE_URL/v1/agent/projects with X-Api-Key, find match on slug or project_key.
  • If exactly one match → show Project: <name> (<id>) and ask for confirmation.
  • If zero or multiple → ask operator to disambiguate.

Step 3 — Parse plan markdown

Read the plan file at <plan path>. Extract:

  • plan_version from the latest amendment — the highest v number, not the last block in file order (see §Parsing rules) — (e.g. Amendment (v1.9 …)), else header (e.g. # Full Plan v1.7 or **Version:** v1.7), else prompt; header ≠ latest amendment → show derived value in preview for confirmation.
  • Milestones from ### M<n> — <name> sections (in order).
  • Tasks from #### Tasks - M<n>: … tables with columns ID, Description, Files, FR/NFR, Complexity, Acceptance, Status.
  • Build manifest per §Manifest envelope.

Validation before dry-run:

  • manifest_version == 1
  • All plan_ref unique, correct regex
  • All milestone_ref exist in milestones
  • tasks ≤ 500, milestones ≤ 100
  • title 1–120 chars, name 1–200 chars
  • Every milestone has non-empty summary
  • Every task description starts with ## Intent and contains ## Acceptance (when acceptance exists) and ## Technical details (when provenance exists) — no **Provenance:** and no --- line
  • All statuses mapped to valid vocab (unknown → ask)

Step 4 — Dry-run preview

curl -s -X POST "$BASE_URL/v1/projects/$PROJECT_ID/plan-import?dry_run=true" \
  -H "X-Api-Key: $KEY" \
  -H "Content-Type: application/json" \
  -d @manifest.json

Parse response. Show table:

KindCountDetails
Milestones createdN…
Milestones updatedN…
Milestones obsoleteN…
Tasks createdN…
Tasks updatedN…
Tasks obsoleteN…
Tasks reactivatedN…
Conflicts — action requiredN(kind, plan_ref, detail) — resolve before/after commit
Conflicts — informationalN(kind, plan_ref, detail) — e.g. status_divergence, proceeds unchanged

Print: Nothing written yet. Obsolete = flagged, never deleted. Local statuses preserved (plan-ahead statuses → follow-up list).

Preview sample (one task): show the composed title (≤120 chars, single clause), and the description with ## Intent, ## Acceptance bullets, ## Technical details list — so the operator can verify the new format before confirming.

Step 5 — Operator confirmation (Form B handoff)

**Needs your approval:**
1. Proceed with import to project <name> (<id>)? — see manifest.json (lines 1–50)

**Next step:**
`@plan-sync sync - <plan path> --project <id> --confirm`

Wait for explicit yes. If not yes → stop.

Step 6 — Commit (real POST)

curl -s -X POST "$BASE_URL/v1/projects/$PROJECT_ID/plan-import" \
  -H "X-Api-Key: $KEY" \
  -H "Content-Type: application/json" \
  -d @manifest.json

Step 7 — Report result

Print PlanImportResult from server. Include activity feed pointer. Close per Operator handoff contract.


Procedure (dry-run mode)

Steps 1–4 only. Stop after preview. Close per Operator handoff contract (Form A or B).


Procedure (status mode)

Run key resolution, test GET /v1/agent/projects, list project names/ids. Close per Operator handoff contract.


Procedure (help mode)

Show modes table, auth setup (@project-query-setup key), limits (500 tasks, 100 milestones), manifest version (1), endpoint (POST /v1/projects/{id}/plan-import), and that dry-run is mandatory before commit. Note that tasks now use the three-block description format (## Intent, ## Acceptance, ## Technical details), titles are short labels (≤120 chars, no markdown), and milestones include a one-sentence summary.


Anti-patterns to refuse

  • Claiming "imported" without a live PlanImportResult response
  • Skipping dry-run and going straight to commit
  • Asking the user to paste their API key into chat
  • Storing the key in /tmp or any non-~/.tools-project-key location
  • Logging the key value in any output
  • Attempting to work around 401/403/404 errors
  • Modifying the plan file or any .work/ artifact
  • Inventing a resolution for an ambiguous project match — ask the operator

Reference

DocPath
Plan import SPEC.work/features/plan-sync/20260929-SPEC.md (tools-project repo)
MCP server (read-only).opencode/mcp/project-mcp/mcp_server.py
Auth/key setup@project-query-setup key
Operator handoff contract.ai/skills/SKILL_DEPENDENCIES.md

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.