loopx-material
Skill6.2k starsChanged 2 months agoApache-2.0View on GitHub
Operate an explicitly activated LoopX Material Lifecycle for a connected project. Use for material-store inventory, lossless migration, candidate/archive transitions, exact-read-backed ranking, ranked-entry rebuilds, bounded Explore intake, owner-gated apply, rollback, and audit. Do not use for ordinary one-off reading or research when the project has not activated Material Lifecycle.
Trending
More talk lately.thin dataabout the whole repository
Who's talking about loopx-project/loopx
- dshplugin/dsh-plugin-hub“fix: honor catalog release packages instead of repository root”GitHub · Oct 4, 2026
- YamilAyma/enlaces-para-desarrolladores“Enlaces rotos detectados en el README”GitHub · Oct 4, 2026
- YamilAyma/enlaces-para-desarrolladores“Fix broken links and redirects in README”GitHub · Oct 2, 2026
- songoow/loopx“docs(book): consolidate evidence, recovery and collaboration”GitHub · Sep 30, 2026
- fendouai/awesome-deepseek-harness“Weekly discovery: new DeepSeek Harness ecosystem candidates”GitHub · Sep 28, 2026
The biggest 5 of 10 mentions linking to the repository that our crawl found. Each line is their own headline.
See all 10
Talked about on GitHub (10 times).
On GitHub · 10
- Oct 4, 2026fix: honor catalog release packages instead of repository root — dshplugin/dsh-plugin-hub0 reactions · 1 comment
- Oct 4, 2026Enlaces rotos detectados en el README — YamilAyma/enlaces-para-desarrolladores0 reactions
- Oct 2, 2026Fix broken links and redirects in README — YamilAyma/enlaces-para-desarrolladores0 reactions · 2 comments
- Sep 30, 2026docs(book): consolidate evidence, recovery and collaboration — songoow/loopx0 reactions · 1 comment
- Sep 28, 2026Weekly discovery: new DeepSeek Harness ecosystem candidates — fendouai/awesome-deepseek-harness0 reactions · 1 comment
5 more on GitHub
- Sep 27, 2026feat(work-state): index LoopX — control plane for long-horizon agents — ZhenningLang/GitHub-Michelin0 reactions
- Sep 27, 2026Enlaces rotos detectados en el README — YamilAyma/enlaces-para-desarrolladores0 reactions · 2 comments
- Sep 26, 2026Run — VibeFin/loopx0 reactions · 2 comments
- Sep 21, 2026Weekly discovery: new DeepSeek Harness ecosystem candidates — fendouai/awesome-deepseek-harness0 reactions · 1 comment
- Sep 20, 2026Enlaces rotos detectados en el README — YamilAyma/enlaces-para-desarrolladores0 reactions
In this repository10 other files it gives its agents.
- AGENTS.mdAGENTS.md
- loopx-benchmarkSkill
- loopx-change-qualitySkill
- loopx-doc-registrySkill
- loopx-performance-diagnosisSkill
- loopx-pr-mergeSkill
- loopx-projectSkill
- loopx-pr-programSkill
- loopx-pr-reviewSkill
- loopx-self-repairSkill
The file
Show its rules and text
We split this skill into the rules it gives an agent
25 rules. About 0 are common, 23 are distinctive, and 2 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈23
Distinctive · estimate
This author's own choices. Worth a look.
2
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 8
Use this skill for the lifecycle and authority of a project's durable material store.
- Very specific: line 24
Use --surface claude-code or --surface opencode for those hosts.
- Distinctive: line 33
Before changing a material store:
- Very specific: line 44
Run loopx material-lifecycle architecture --format json and preserve its default-off, owner-gated, provider-neutral boundaries.
- Distinctive: line 47
If the project-local skill is missing, preview an explicit project install.
- Distinctive: line 54
Keep these responsibilities separate:
- Distinctive: line 71
Read the source authority before proposing structural change.
- Distinctive: line 75
Keep raw content, private paths, URLs, provider payloads, and credentials out of public packets and commits.
- Distinctive: line 80
No migration, rebuild, or rerank may begin from an unverified partial parse.
- Distinctive: line 84
Use stable material references across:
- Distinctive: line 92
Every transition needs a revisioned evidence or decision reference.
- Distinctive: line 106
Do not start Explore merely because the current list feels incomplete.
- Distinctive: line 112
Before reporting candidate intake complete, settle its ranking against the current Decision Context:
- Distinctive: line 123
keep candidate intake and ranking as separate receipts and, when ranking changes, separate authority revisions.
- Distinctive: line 130
If ranking apply, readback, projection, or rollback readiness fails, repair or roll back before reporting the intake as complete.
- Distinctive: line 138
Default to at most three primary materials per ranked entry.
- Distinctive: line 139
When an entry exceeds the limit, create deterministic child entries and rank them independently.
- Distinctive: line 141
Do not hide overflow in an unranked supporting index.
- Distinctive: line 145
Keep an explicit ranked backlog beyond a visible Top-N.
- Distinctive: line 160
Keep proposal and apply receipt separate.
- Distinctive: line 168
keep at most three primary materials per entry.
- Distinctive: line 170
keep project-specific taxonomy, summaries, judgments, links, and language in the private project adapter.
- Distinctive: line 173
never treat the readable Markdown as ranking or source authority.
- Distinctive: line 192
After apply, read the destination back and write an audited receipt.
- Distinctive: line 230
Stop without mutating the source when:
≈ “Common” is an estimate: at least 1 in 5 of the 213,895 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
LoopX Material
Use this skill for the lifecycle and authority of a project's durable material store. Source discovery, domain-specific scoring, and note writing may be provided by project skills; this skill owns the generic lossless lifecycle.
LoopX ships the canonical source for this skill, but does not install it into the user's global skill directory. Install a managed copy only in a connected project that explicitly enables Material Lifecycle:
loopx project-skill install \
--project . \
--skill loopx-material \
--surface codex \
--executeUse --surface claude-code or --surface opencode for those hosts; repeat the
flag to install multiple host-native copies in one transaction. Managed copies
live under .agents/skills/, .claude/skills/, or .opencode/skills/ and are
upgraded or removed through the same CLI. Project-local discovery does not
itself activate material-store writes; the selected goal still needs explicit
Material Lifecycle authority.
Activation Gate
Before changing a material store:
- Resolve the current project,
goal_id, registered agent, and active todo throughloopx start-goal --guided,loopx status, orloopx diagnose. - Run
loopx project-skill status --project . --skill loopx-materialand confirm the required host surfaces are current. - Confirm the selected todo explicitly targets
material_lifecycle, or that the goal authority declares an active Material Lifecycle profile and its source store. A catalog entry or project-local skill is not activation. - Confirm the goal boundary covers the exact private adapter and authority paths. Public LoopX contracts never grant access to private source content.
- Run
loopx material-lifecycle architecture --format jsonand preserve its default-off, owner-gated, provider-neutral boundaries.
If the project-local skill is missing, preview an explicit project install; do not fall back to a global copy. If activation or authority is missing, stop before source mutation. Create a bounded setup todo or owner gate; do not invent a store or treat chat history as authority.
Ownership Boundary
Keep these responsibilities separate:
- Project source adapter: locates and reads the project's private source files, database, documents, or provider.
- Research/reader skill: recalls candidates, performs exact reads, and produces source-quality and domain-value evidence.
- Decision Context: supplies revision-bound objectives, changed facts, conflicts, and accepted decisions.
- Material Lifecycle: owns inventory, migration, lifecycle transitions, ranked-entry rebuild, rerank proposals, apply receipts, and rollback.
- Content or notes workflow: consumes selected material and produces an artifact; it does not rewrite candidate/archive/ranking truth by itself.
Workflow
1. Snapshot And Inventory
Read the source authority before proposing structural change.
- Record source revision, byte/content digest, lifecycle counts, parse errors, stable material references, and a verified backup.
- Keep raw content, private paths, URLs, provider payloads, and credentials out of public packets and commits.
- Preserve the original source until a verified cutover and rollback rehearsal have both succeeded.
No migration, rebuild, or rerank may begin from an unverified partial parse.
2. Normalize Lifecycle
Use stable material references across:
candidate -> active -> archived
\-> carryover
archived -> activeEvery transition needs a revisioned evidence or decision reference. Archiving must preserve the original source reference and an archive reference. Reading, summarizing, or publishing a note does not implicitly archive a material.
3. Promote Exact-Read Evidence
Recall is advisory. Before a material affects ranking or lifecycle:
- retrieve the candidate through the configured provider or local search;
- exact-read the authoritative source;
- record source revision and read scope;
- reject stale, conflicting, unreadable, or only-secondary claims;
- pass only promoted evidence into Decision Context or ranking.
Do not start Explore merely because the current list feels incomplete. Explore begins only from a named evidence gap, bounded query plan, budget, and stop condition.
4. Settle Candidate Ranking
Before reporting candidate intake complete, settle its ranking against the current Decision Context:
- record exactly one disposition:
top_window,ranked_backlog, orno_change; - let the project adapter classify value from exact-read evidence, current objectives, overlap, and artifact convertibility rather than tier alone;
- require high-value materials to gain verified membership in the Top-N or explicit ranked backlog;
- require a reason for
no_changeand use it only for standard-value or substantially duplicative materials; - keep candidate intake and ranking as separate receipts and, when ranking changes, separate authority revisions; then join them with an intake-ranking settlement receipt;
- preserve displaced Top-N entries in the ranked backlog and preserve protected anchors unless changed Decision Context or explicit owner authority moves them.
If ranking apply, readback, projection, or rollback readiness fails, repair or roll back before reporting the intake as complete.
5. Rebuild Ranked Entries
A ranked entry must represent one independently sortable reading or action unit, not a display bucket.
- Default to at most three primary materials per ranked entry.
- When an entry exceeds the limit, create deterministic child entries and rank them independently.
- Do not hide overflow in an unranked supporting index.
- Preserve exact membership: every selected material appears exactly once across the ranked set.
- Preserve stable material references and canonical source records.
- Keep an explicit ranked backlog beyond a visible Top-N.
Splitting is semantic, not mechanical. Group materials only when they jointly support one decision or learning outcome; separate materials whose value, urgency, reader action, or evidence maturity differs.
6. Propose A Bounded Rerank
Rerank from revision-bound Decision Context evidence.
- Protect pinned entries and the project's declared stable prefix.
- Limit moved entries and rank displacement unless the owner explicitly approves a structural rebuild.
- Distinguish a rank move from lifecycle change and from new candidate intake.
- Emit a no-change proposal when evidence does not justify movement.
- Keep proposal and apply receipt separate.
7. Build A Readable Projection
The managed catalog remains authority, but operators need a readable view. Build that view from exact-read-backed presentation records:
- preserve contiguous ranks and the explicit ranked backlog;
- keep at most three primary materials per entry;
- require every expected selected material exactly once;
- keep project-specific taxonomy, summaries, judgments, links, and language in the private project adapter;
- emit a content-free receipt with revision, counts, digest, and verification;
- never treat the readable Markdown as ranking or source authority.
LoopX owns validation, rendering, and the content-free receipt contract. The project adapter owns source parsing and supplies already-promoted display records. One-time legacy parsing and migration scripts remain project-local.
8. Apply With A Lossless Gate
Preview first. Apply only when all are true:
- source and backup digests still match the inventory;
- parse errors are zero or explicitly owner-approved;
- expected source/canonical counts match;
- ranked coverage and unique membership are exact;
- protected entries remain valid;
- compare-and-swap revision matches;
- rollback has been rehearsed;
- the owner gate authorizes this exact plan.
After apply, read the destination back and write an audited receipt. On any mismatch, restore the previous authority and record the blocker. Never report "migration complete" from a preparation plan alone.
Project Adapter Contract
A project-specific skill or AGENTS.md may define:
- source locations and private provider setup;
- topic taxonomy and domain scoring;
- reading tools and source-specific fallbacks;
- user-specific priorities;
- note/archive destinations and public/private redaction;
- concrete backup and restore commands.
It should reference this skill instead of duplicating generic migration, ranking, rebuild, apply, or rollback rules. Project rules may tighten these invariants but must not weaken them.
Completion Evidence
A complete material operation reports:
- source and destination revisions;
- backup and source-digest verification;
- parsed and canonical counts;
- lifecycle-count delta;
- intake ranking disposition and value classification;
- ranked-entry count and maximum primary-member count;
- exact coverage and duplicate count;
- promoted/rejected exact-read evidence;
- proposal and apply receipt references;
- intake-ranking settlement receipt reference;
- rollback result;
- next bounded action or explicit no-change.
Stop Conditions
Stop without mutating the source when:
- the project or goal is ambiguous;
- Material Lifecycle is not explicitly active for the selected goal;
- source authority, backup, revision, or stable ids cannot be verified;
- exact-read evidence conflicts with the proposed change;
- overflow would be hidden rather than independently ranked;
- a migration would lose bytes, records, references, or recoverability;
- the required owner gate, write scope, or rollback path is absent;
- public output would expose private material or credentials.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.

